CSConjoint Survey

Plan Before You Field

Use these transparent planning checks to scope a study. Confirm consequential designs with a methodologist or study-specific power analysis.

A/B Sample Size

Plan a two-group conversion test

Approximate respondents needed in each group using a two-sided comparison of proportions.

1,775people per group, about 3,550 total

Conversion Lift

Translate a rate change into outcomes

See the practical size of an observed rate difference.

+30estimated conversions across 1,000 visitors

Conjoint Planning Check

Check design information

A common rule-of-thumb screen, not a study-specific power analysis.

4,800profile observations; rule-of-thumb minimum sample 125

Software Cost

Compare recurring and one-time pricing

Compare software prices only; respondent recruitment is separate.

$1,100difference versus a $100 One-Time Payment over 2 year(s)